The Worst Case
Review started late in design cycle
- Limited documentation
- Little or no analysis
- Limited contact with designers
Reviewer’s task:
- Lots of reverse engineering
- Problems found in analysis require redesign
- Management reluctant to redesign or continue review
High probability of mission failure